Service Hotline:+0086 571 8620 8669
CONTACT/ Guanhang
Telephone +0086 571 8620 8669

WhatsApp:0086 19943450917

Hotline:+0086 571 8620 8669

Phone :+0086 571 8620 8669

Address:Hangzhou Yuhang Economic and Technological Development Zone

Your location: Home > News > Company News

Company News

Welding of high-altitude pipelines in the factory building, wearing a crown aviation anti fall device for safe operation

Time:2026-03-02 10:32:05 Click:111

During the installation and construction of pipelines in the factory building, the risk of high-altitude pipeline welding operations is relatively high. In order to ensure the safety and smooth completion of welding tasks by the operators, protective measures are strictly implemented during the construction process. Welding personnel wear protective tools such as fall arresters, safety belts, and helmets throughout the process, and carry out high-altitude operations on the lifting platform. The operation is standardized and the bottom line is strictly observed.

Before homework, all preparation work should be carried out in an orderly manner. The staff conducted a comprehensive inspection of the lifting platform vehicle, checked the braking, lifting, and safety limit devices, and confirmed that there were no hidden dangers. After that, the vehicle was parked in a flat and solid area, the support legs were firmly fixed, a warning area was designated, and a dedicated person was arranged for supervision. Welding personnel must hold a certificate to work, inspect the integrity of fall arresters, safety belts, and helmets one by one, wear them correctly, receive safety technical instructions, and clarify the welding process and emergency response methods.

During the operation, the welding personnel ride on the lifting platform truck to rise steadily, control at a constant speed, avoid obstacles above, and after reaching the designated height, lock the platform firmly. At the same time, hang the anti fall device and safety belt at a reliable hanging point, and double protect to build a strong safety barrier. It is strictly prohibited to extend the guardrail for operation. During the welding process, standardize the operation of equipment, clean the surrounding flammable materials, equip fire extinguishing equipment, take good ventilation and dust reduction measures, and balance welding quality and operation safety.

After the homework is completed, the welding personnel clean up the site, turn off the equipment power, confirm that there are no safety hazards, operate the platform vehicle smoothly to the ground, organize protective tools and equipment, and keep maintenance records. Throughout the process, protection is prioritized and standards are the guiding principle. With comprehensive protective measures and standardized operating procedures, the high-altitude pipeline welding task is successfully completed, ensuring the steady progress of the factory pipeline installation project.



Tags:

Recommend

QQ-Online
Hotline

Hotline

+0086 571 8620 8669

Wechat
hotline service
Gototop
XChenghua fall Protector Factory

Screenshot, wechat identification QR code

Wechat:0086 19943450917

(Click wechat copy to add friends)

  Open wechat app

Wechat has been copied, please open wechat to add details!